Connect with us:

energy battery containers

We have established a new EPC division in partnership with BessCo, our sister company encompassing an experienced engineer-procure-construct (EPC) team that is fully integrated under one roof which can be the key to predictable results in renewables projects. From project development and permitting to interconnection, construction and startup, an integrated EPC partner like Bitech can be your competitive advantage in cost saving.

Inflation Reduction Act

The Inflation reduction Act (IRA) can deliver much needed certainty to developers and owners of solar, wind, energy storage and other clean energy technologies. The IRA broadens and enhances a range of tax credits, opening the door for cooperatives and utilities to start self-building new projects over the next decade. Bitech stands ready to help you take advantage of available incentives and funding to accelerate your renewable projects moving forward.

Renewables Construction

When it comes construction projects for renewable, Bitech can offer exemplary performance on wide-ranging construction projects, large and small, across the country. We stand equally ready to offer general contractor and design-build services for your projects in the renewable construction realm.

Our people are committed to doing the right job in the right way, offering an unswerving focus on safety, quality, schedule, and performance. Whether you need design, procurement, scheduling, expediting or other construction phase services for your renewable construction project, our EPC team has the knowledge and experience to complete all duties and responsibilities on time and within budget. We have one goal - Making our clients successful, as we aren't successful until they are.

energy battery containers

Energy Storage Construction

As we mitigate risks through better constructability, Bitech focuses on the 4 M’s. - Manpower, Materials, Machineries, and Methods.

Lithium-based battery technology for utility-scale battery energy storage system (BESS) installations is advancing rapidly. Manufacturers are continually modifying designs to optimize the configurations of battery modules, bidirectional inverters, thermal management systems, AC main breakers and controls so units can be shipped as ready-to-install units. These advances are changing the way that mega scale battery energy storage facilities are designed and built.

These changes are making it even more important to engage in detailed site planning and to efficiently execute a wide range of preconstruction tasks with early input from construction.

Regardless of the sun shining or wind blowing, we are imperative in maintaining reliable energy service. While moving parts are always involved in any energy storage project, seamless EPC experience and integrated coordination at Bitech are very key to on-budget and on-time projects.

verticle energy battery containers

Interconnection and Substation

As we embrace the option to build, we witness the growth of renewable generation and evolving energy standards can create schedule and budget challenges for both utilities and developers. Bitech can provide affordable, high quality and resilient grid interconnection solutions for renewable generation projects which can be made smoother by leveraging inhouse capabilities and leaning into utility relationships to deliver on-time, customer-focused solutions within our budgets.

horizontal energy battery containers

Solar Construction

Bitech partners with our sister company BessCo to offer upfront planning and seamless construction integration which are very critical for solar projects. With an integrated EPC approach, vital components like concept development, Geotech, permitting and site optimization are well planned for and carefully designed with constructability in mind, thus leading to less unpredictability in terms of budget and installation cost.

horizontal energy battery containers

Wind Construction

Wind power projects have very high level of very complexity. As the wind industry rapidly approaches the inevitable end of the Production Tax Credit, a significant backlog of projects is expected to come online in rapid succession. Developing, designing, and building these projects will pose a major challenge to the industry.

At Bitech, we have an integrated team that can handle from grid planning, site layout to interconnection handoffs and capacity analysis, an integrated, experienced team can take projects to completions.

horizontal energy battery containers